Publication Abstract




Proceedings of the Deep Mixing 2015 Conference, (DFI)

Rocky Mountain Arsenal Section 36 Lime Basin Soil Remediation Project - Seepage Barrier
Douglas M. Barber, Raito, Inc., United States; A. David Miller, P.E., Raito, Inc., United States

The Rocky Mountain Arsenal was used by the military to produce chemical warfare agents and incendiary munitions for use during World War II and later by private companies for the production of industrial and agricultural chemicals. After an investigation performed in accordance with CERCLA confirmed significant levels of contamination due to the common industrial and waste disposal practices of the era and the discovery of over 300 species of wildlife inhabiting the land the Rocky Mountain Arsenal became a wildlife refuge and contamination cleanup efforts began. Three lime basins originally used to treat wastewater from the chemical production were decided to be contained in place, requiring a seepage barrier installed around the perimeter of the site to further prevent groundwater/contaminant migration. This case study will discuss the successful installation of a soil-bentonite cutoff wall around the area using deep soil mixing. Highlights of this case study will also include a discussion of the challenges faced due to construction activities performed with Level B Hazmat PPE requirements as well as added challenges brought on by the Winter season, after the project was delayed due to a positive air monitor detection for the chemical weapon Lewisite during construction of the work pad.


 article #2054; publication #1013 (DM-2015)