Publication Abstract




Proceedings of the International Conference on Deep Foundations, Seepage Control and Remediation (41st Annual), 2016, New York, NY-Deep Foundations Track, (DFI)

“TREVI-CALATORE”: AN INNOVATIVE SYSTEM FOR THE INSTALLATION OF STRUCTURAL COLUMNS IN TOP-DOWN EXCAVATION AND TUNNELING
Alessandro Bertero, Vincenzo Tirozzi, Manuel Toniolo

The installation of foundation elements (large-diameter Bored Piles or Diaphragm Walls) for the execution of underground works to be performed through the "Top Down" Technique (Stations, Car Parks, Subways, Artificial Tunnels) often requires the insertion


 article #2468; publication #1023 (AM-2016-DF)