Publication Abstract




Proceedings of the International Conference on Deep Foundations, Seepage Control and Remediation (41st Annual), 2016, New York, NY-Deep Foundations Track, (DFI)

GOETHALS BRIDGE REPLACEMENT PROJECT - PERFORMANCE-BASED DESIGN OF THE DRILLED SHAFT FOUNDATIONS
Chunli Wei, Mark Jen, Xiaojun Wang

After more than 85 years of service, a critical link between New York and New Jersey, the Goethals Bridge over the Arthur Kill waterway, is being replaced with two new parallel bridges. Each bridge includes 1,650 feet long signature steel composite cable-


 article #2507; publication #1023 (AM-2016-DF)