Publication Abstract




Proceedings of the International Conference on Deep Foundations, Seepage Control and Remediation (41st Annual), 2016, New York, NY-Seepage Control & Remediation Track, (DFI)

Analysis and Behavior of Double Sheet Pile Cofferdam
Bashar S. Qubain, Jianchao Li, Kamil Nuzha

The Philadelphia Water Department is rehabilitating Belmont Raw Water Basin. As part of this work, a 500-ft long, temporary cofferdam was designed to retain 35 ft of combined water and soil at the western half during the reconstruction of the eastern half


 article #2542; publication #1024 (AM-2016-SC)