Proceedings of the International Conference on Deep Foundations, Seepage Control and Remediation (41st Annual), 2016, New York, NY-Seepage Control & Remediation Track, (DFI)

DESIGN AND CONSTRUCTION OF THE CANNELTON HYDROELECTRIC PLANT COFFERDAM AND CUT-OFF WALL
James M. Tantalla, Roderic A. Ellman, Dwight Metcalf

The construction of a new low head hydro-electric plant at the Cannelton Lock and Dam required the design and construction of a cofferdam to accommodate a deep excavation extending approximately 150 feet below the Ohio River levels. The new plant, which g