GROUTING OF AN ARTESIAN ZONE IN ADVANCE OF POWERHOUSE EXCAVATION FOR THE RED ROCK HYDROELECTRIC PROJECT
Rachael V. Bisnett, Thomas G. Andrews, Dewey W. Geary, R. Michael Bivens

The powerhouse for the Red Rock Hydroelectric Project is being constructed at the toe of the existing U.S. Army Corps of Engineers’ Red Rock Dam immediately adjacent to the existing stilling basin retaining wall. The powerhouse excavation extends though