Publication Abstract




Proceedings of the International Conference on Deep Foundations, Seepage Control and Remediation (41st Annual), 2016, New York, NY-Seepage Control & Remediation Track, (DFI)

Jet Grouting for Groundwater Cutoff at Tie-in between Existing Tunnel and New Construction
Chu E. Ho, Aaron Evans, Tom Richards

This paper describes an innovative case history of using jet grouting to form a groundwater cutoff wall at the interface of a cut-and-cover construction and an existing tunnel. The design of the jet grouting layout was complicated by the presence of a lef


 article #2548; publication #1024 (AM-2016-SC)