Proceedings of the International Conference on Deep Foundations, Seepage Control and Remediation (41st Annual), 2016, New York, NY-Seepage Control & Remediation Track, (DFI)

WILLOW ISLAND HYDROELECTRIC PROJECT: TAMING THE OHIO RIVER TO CREATE GREEN ENERGY
James M. Tantalla, Roderic A. Ellman, Jr.

Construction of the powerhouse for the Willow Island Hydroelectric Project, located atthe Willow Island Lock and Dam, required a 120-ft deep temporary excavation inside the limits of a cellular cofferdam on the Ohio River side of the excavation and a