article# |
description |
author(s) |
2537 |
A Seepage Control Cutoff in an Extreme Saline Environment |
Iván Contreras, Jon Ausdemore, Rachel Leier, Aaron Grosser, Amr Ragy, Kevin Green, |
2538 |
After Sandy: The Bay Park W.T.P. flood control project. |
Gilbert Tallard, David Guy, John Stanbury |
2539 |
Remedial Drilling and Grouting at Abiquiu Dam, NM and Fluid Losses in the Embankment, a Case History |
Amy F. Ebnet, Suzanne R. Hess-Brittelle, Tyler J. Quick, Sharon L. Schulz |
2540 |
Diaphragm Wall Construction, Instrumentation, and Testing for a Hydroelectric Power Facility |
Jeff A. Segar, PE, SE, Nicolas A. Willig-Friedrich, David Gatto |
2541 |
Seismic Stability Analysis of Seepage Control Measures for Levees in Central Valley, California |
Zia Zafir |
2542 |
Analysis and Behavior of Double Sheet Pile Cofferdam |
Bashar S. Qubain, Jianchao Li, Kamil Nuzha |
2543 |
CUT-OFFS IN TEMPORARY COFFER DAMS AS SEEPAGE BARRIERS FOR CONCRETE DAM CONSTRUCTION –A CASE STUDY OF TEESTA – V H E PROJECT IN SIKKIM (INDIA) |
I D DAYAL, ANIL KUMAR JAIN |
2544 |
DESIGN AND CONSTRUCTION OF THE CANNELTON HYDROELECTRIC PLANT COFFERDAM AND CUT-OFF WALL |
James M. Tantalla, Roderic A. Ellman, Dwight Metcalf |
2545 |
DRAWDOWN OF GROUND WATER CONTROL SYSTEM IN DEEP EXCAVATION SUR-ROUNDED BY CUTOFF WALLS: NUMERICAL INVESTIGATION |
Dalia. R. Mohamed, Marawan M. Shahien, Hisham H. Hafez |
2546 |
Ground Freezing For Groundwater Cutoff at the Seattle Seawall Replacement Project |
Daniel Mageau, Brenton Cook, SoilFreeze |
2547 |
GROUTING OF AN ARTESIAN ZONE IN ADVANCE OF POWERHOUSE EXCAVATION FOR THE RED ROCK HYDROELECTRIC PROJECT |
Rachael V. Bisnett, Thomas G. Andrews, Dewey W. Geary, R. Michael Bivens |
2548 |
Jet Grouting for Groundwater Cutoff at Tie-in between Existing Tunnel and New Construction |
Chu E. Ho, Aaron Evans, Tom Richards |
2549 |
METRO ROME LINE "C" - ARTIFICIAL GROUND FREEZING APPLICATION FOR THE UNDERPASS OF THE EXISTING METRO STATION SAN GIOVANNI - LINE "A" |
Alessandro Bertero, Ferruccio Cribari, Roberto Sorge, Eliano Romani, Giulia M.B., Francesca Casini |
2550 |
WILLOW ISLAND HYDROELECTRIC PROJECT: TAMING THE OHIO RIVER TO CREATE GREEN ENERGY |
James M. Tantalla, Roderic A. Ellman, Jr. |
2551 |
Interactive 3-Dimensional Modeling of Anchors at Bluestone Dam |
Jamey Rosen, Georgette Hlepas |
2552 |
AN EVALUATION OF SOIL-BENTONITE BACKFILL CONSOLIDATION PROPERTIES |
Jeffrey C. Evans, Hejintao Huang, Daniel G. Ruffing |
2553 |
Bentonite Self-Hardening Slurry Mix Variations and Field Implementation Methods |
Christopher R. Harris |
2554 |
CASE STUDY: FEATHER RIVER WEST LEVEE PROGRAM CUTOFF WALLS |
Jared P. Williams, Kyle R. Lackner |
2555 |
Cockatoo Island Seepage Barrier - Permeation Grouting, Jet Grouting and a Soil/Cement/Bentonite Mixed Slurry Capping Trench |
Russell J. Denny, Chris L. Powell |
2556 |
CONSTRUCTION OF THE TAILINGS STORAGE FACILITY FRESHET MANAGEMENT EMBANKMENT CUT OFF WALL AT MOUNT POLLEY MINE |
Keith MacKay, David Siddle, Luke Moger, Terry Eldridge |
2557 |
Innovative Grouting Techniques for Installation of a Seepage Barrier at Barrage des Quinze Dam (Quebec, Canada) |
Michael Byle, Peter Bowman, Danny Déry-Chamberland |
2558 |
Seepage Barrier at Bolivar Dam |
Mohamed Elgouhary, Daniel Koziol, Carol L. Tasillo |
2559 |
Seepage Barrier Mix Design Development, Installation, and Evaluation |
George W. Little, John Councilman |
2560 |
Use of enhanced pre-mixed self-hardening grout for an emergency cut-off wall intervention in west africa |
Bruno Vingiani, Claudio Asioli, Maurizio Siepi |
2561 |
Wadi Dayqah Dam Curtain |
Frank Haehnig, Dr. Harald Krenn, Harm-Christoph Claassen |
2562 |
Analysis of Water Leakage in downstream dam toe of Komani Dam |
Përparim Alikaj, Arjan Beqiraj, Arjan Jovani, Altin Karriqi |
2563 |
Cannonsville Dam Emergency Borehole Response |
Paul C. Schmall, P.E., John Vickers, P.E., William H. Hover, P.E. |
2564 |
Gowanus Pumping Station: Design and Construction Challenges related to excavation support, seepage mitigation and structure foundation using jet grout bottom seal and deep jet grout support columns. |
Paul J. Lewis, Paul C. Schmall, John M. Stanbury, Kevin Clarke, |
2565 |
IMPROVED DRAINAGE BY DRILLED FILTER DRAINS, DAM SAFETY UPGRADE, CASE STUDY |
Ĺke B. Nilsson, Carl-Oscar Nilsson |
2566 |
Rehabilitation of the Kölnbrein Dam/Austria |
Frank Haehnig, Kurt Kogler |
2567 |
A review of guidelines for dewatering design within the Abu Dhabi Municipality |
Juan J. Gutierrez, Raghav Ramanathan, M. Melih Demirkan, Jared Deible, Michael Rosenmeier, Mazen Elias Adib |
2568 |
Drilling and Grouting for the Rehabilitation of Contaminated Areas: An Italian Case History |
Raffaella Granata, Daniele Vanni |
2569 |
Laboratory Modeling of Internal Erosion in Dam Foundations |
John D. Rice, Kenneth E. Henn, David B. Paul, Brian H. Greene |
2570 |
Alternative Analytical Methods for Borehole Permeability Tests in Seepage Barrier Walls |
R. Lee Wooten, David R. Shields, Darren D. Clark, |
2571 |
Assessment of the durability of cementitious barrier materials |
Stephan A. Jefferis, Adrian H. Bath, |
2572 |
DIAPHRAGM WALLS FOR SEEPAGE CONTROL AND REMEDIATION: A COMPARISON OF THREE CASE HISTORIES |
Raffaella Granata, Mario Mauro, Fabio Santillán |
2573 |
Unified Specifications for Soil-Mixed Seepage Cutoff Walls |
Erik James, Jose R. Gomez, Wayne S. Smith |