(ACIP-2002) Proceedings - DFI Specialty Seminar,
Augered Cast-In-Place Piles Seminar- 2002, San Francisco, CA

article# description author(s)
952 Installation of Augered Cast-in-Place Piles Tracy Brettmann, PE
953 Augered Cast-in-Place Pile Inspector's Video Acknowledgements Rudolph P. Frizzi, P.E.
954 Quality Control of Augered Cast-in-Place and Displacement Piles Rudolph P. Frizzi, P.E.
955 Auger Pressure Grouted Displacement Piles Installed & Tested on the Margins of the San Francisco Bay Christian Divis, Cary Ronan
956 The Colosseum at Caesars Palace, Las Vegas: A Case Study of Design Build CFA Foundations Gordon King
957 San Bruno Jail Augered Cast-in-Place Pile Case History Mike Majchrzak
958 Automated Instrumentation for ACIP and Drilled Displacement Piles John Lemke, G.E.
959 Capitol Area East End Complex Blocks 171 through 174 Sacramento, CA: A Case History involving the Application of APGD and APG Piling Methods Brian R. Zuckerman, P.E.